November 19, 2026
On the southwest corner of the Church Street and Truckee Way roundabout, a 0.95-acre parcel sits between the Community Methodist Church and the Union Pacific tracks. It has a large rock formation on its northwest edge and an old shed that the Town recently reclassified as a nonessential historic building. On August 25, 2026, the Truckee Town Council upheld approval of the Truckee Railyard Hotel for that lot. The approved project has 60 hotel rooms and 17 condominiums sold to individual owners.
The Town signed a Development Agreement for the Railyard in 2017, and staff expects it to expire at the end of 2027.
The Town adopted the Truckee Railyard Master Plan in 2009 after more than 20 years of planning. It amended the plan in November 2016 and renamed it the Truckee Railyard Mixed-Use Development Master Plan. Alongside the plan, the Council approved a Development Agreement with the master developer at the time, Truckee Development Associates, LLC. It includes a Parking Management Plan, an Affordable Housing Agreement and a Streetscape Plan, and the Town anticipates it will expire at the end of 2027.
The agreement took effect on August 24, 2017. Truckee's updated short-term rental program took effect on January 1, 2021. It banned STRs in multifamily projects, capped the number of permits townwide, required a one-year cooling-off period after a unit sells, and added safety standards.
The Town set the 1,255-certificate cap with Ordinance 2022-02 on April 12, 2022. A Town staff report dated September 22, 2026 put the waitlist at 19.6 months, based on data through June 2026. Over the prior three years the Town received about 400 waitlist applications a year and released a little over 130 spots a year for registration.
The Town's fee schedule, effective November 8, 2026, lists a $378 registration fee and a $478 annual renewal. It sets transient occupancy tax at 12% of rent, plus a separate 2% Truckee Tourism Business Improvement District assessment.
According to the August 25 Council staff report, the 81,408-square-foot project includes:
A state CEQA filing received September 1, 2026 lists the applicant as CP Truckee LLC. The project went to the Planning Commission on January 20, 2026, which continued the hearing. A revised version came back on May 19 with two more residential units and new retail space on Truckee Way.
Condition of Approval No. 41 requires the hotel and the residences to share one property management company.
The same agreement controls parking, and parking depends on timing too. The Railyard's original developers built 396 parking spaces in the public right-of-way. Those spaces form a shared pool for the whole Master Plan area, and projects draw from it first come, first served as they are built. So far only the Artist Lofts has drawn from the pool. The Old Lumberyard and the Town's Mobility Hub built their own parking on site.
Staff calculated that the hotel generates demand for 123 spaces. With 19 spaces on site, it would use 104 from the district, and its east driveway would remove one more. If building permits are issued, 197 spaces would remain for all future building in the plan area.
In the hotel project, 17 residential spaces are dedicated to the residences. A Railyard condo buyer should check whether a parking space comes with the unit and what it costs, separately from the price of the home.
Since the Master Plan was adopted, the Town has approved the Truckee Artist Lofts, a four-story building with 77 affordable units and 3,600 square feet of ground-floor retail. It has also approved a three-screen movie theater in 2019, a 35,000-square-foot grocery store in 2017, the Old Lumberyard Phase 1 in 2021, Tahoe Truckee Community Foundation's use of the Artist Lofts ground floor in 2025, and the Mobility Hub, with a 900-square-foot transit waiting facility and 42 parking spaces, also in 2025. Before the hotel, the Artist Lofts was the only residential building in the Railyard. That makes the hotel's 17 condos the first homes in the plan area intended for individual ownership.
This post is general information about public Town documents. It is not legal, tax or financial advice. Confirm how any rule applies to a specific property with a qualified attorney or tax professional.
Has the Town decided what happens in 2028? Not yet. Staff has said it anticipates amending the Master Plan after the agreement expires and has named a multifamily STR prohibition as one possibility.
If you're looking at a condo near the Church Street roundabout, or anywhere else in Downtown Truckee, Kaili Sanchez can help with your search. Discover Tahoe Living and start your personalized search.
November 19, 2026
November 12, 2026
November 5, 2026
October 29, 2026
October 22, 2026
October 22, 2026
October 15, 2026
October 8, 2026
October 1, 2026
If you are looking to purchase or sell a home in the Tahoe area, We are here to take care of all the details with that extra personal touch. Our goal is help you fulfill your dreams while you enjoy this beautiful part of the world.